Actor Paths
Paths move actors around within a scene. Each actor within a scene has a path attached, viewable when the actor is selected. Paths have control points running down the path line. A path starts with a green control point and ends with a red control point, yellow control points are in the middle.

Paths have a total time and a time for each segment, this controls how the actor moves down the path. A small time in a long segment will make a actor move down the path with reasonable speed were as a large amount of time in a small segment will move the actor slowly. To add new segments or to adjust points please see the Control Points topic.


 

Control Description

Path

Yellow Points

Each Point in a path is a control point

Square Point

Currently selected control point

Green Point

Path start point

Red Point

Path end point

White Segments
(color is configurable)

Path Segments

Yellow Segments
(color is configurable)

Currently Selected Segment
 
Tooltip

Point Name

Path end point

Segment Time

Displays amount of time between the currently selected point and next point

Time into Path

Displays amount of time that has passed before current point
 
Actor

Button Actor

Actor used for an example

Minibar

The Minibar is displayed on each actor while selected